The socioeconomic feasibility of greening rail stations: a case study in lisbon
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1470272
Parallel machine replacement under horizon uncertainty
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1535012
Multicriteria risk analysis of commodity-specific dock investments at an inland waterway port
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1580808
Index fund optimization using a hybrid model: genetic algorithm and mixed-integer nonlinear programming
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1633450
Postauditing and Cost Estimation Applications: An Illustration of MCMC Simulation for Bayesian Regression Analysis
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1498961
A Three-phase Approach to an Enhanced Index-tracking Problem with Real-life Constraints
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1619887
Optimization of size and timing of base salary increases
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1528408
Variable neighborhood search heuristic for nonconvex portfolio optimization
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1619888
Risk, standard deviation, and expected value: when should an individual start social security?
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1532543
Optimal capital structure of government-subsidized private participation in infrastructure projects
来源期刊:The Engineering EconomistDOI:10.1080/0013791x.2019.1707923
Cost-effectiveness of patient-specific motion management strategy in lung cancer radiation therapy planning
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1597239
Research into the postaudit of capital projects in UK SME organizations
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1508618
An extension to the classical mean–variance portfolio optimization model
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1636440
Ex post evaluation of PPP government-led renegotiations: Impacts on the financing of road infrastructure
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1559384
Validating a model for forecasting the project termination phase using existing business cases
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1555299
Exploring the Accuracy of Joint-Distribution Approximations Given Partial Information
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2018.1512692
Rates of return of investments whose timings are specified by a probability distribution
来源期刊:The Engineering EconomistDOI:10.1080/0013791x.2019.1680784
GAN-MP hybrid heuristic algorithm for non-convex portfolio optimization problem
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1620391
An inexact l2-norm penalty method for cardinality constrained portfolio optimization
来源期刊:The Engineering EconomistDOI:10.1080/0013791X.2019.1636169